Mining loader is a mechanical equipment, which is mainly used for the collection, transportation, construction and loading of crushed stone and soil materials in various mines, hydropower and tunnel projects such as phosphate ore, iron ore, copper mine, gold mine, silver mine, lead-zinc mine, coal mine roadway and so on. The loader shall be installed by personnel. Install according to the structural characteristics of the whole machine and the requirements of the drawings. Here are the key points for assembling the mine loader:
1、組裝各連接螺栓時,應(yīng)檢查防松墊圈是否齊全以及松緊程度是否符合要求。
1. When assembling each connecting bolt, check whether the lock washer is complete and whether the tightness meets the requirements.
2、液壓系統(tǒng)的接頭部分一定要擦拭干凈,不得有灰塵和雜質(zhì)進(jìn)入。同時檢查密封圈是否齊全或損壞,所有管路應(yīng)按原始位置理順固定好。
2. The joint part of the hydraulic system must be wiped clean without dust and impurities. At the same time, check whether the sealing ring is complete or damaged, and all pipelines shall be straightened and fixed according to the original position.
3、整機(jī)安裝完畢后應(yīng)仔細(xì)檢查各部件管件、輔件等,是否安裝正確穩(wěn)妥。
3. After the installation of the whole machine, carefully check whether all parts, pipe fittings and accessories are installed correctly and stably.
4、電氣部件安裝要有專人擔(dān)任。進(jìn)入接線盒的電纜直徑要與橡皮墊的孔徑相符,壓緊接線頭應(yīng)保證橡皮墊與電纜間和橡皮墊與接線盒無間隙,否則將失去隔爆性能。
4. Electrical components shall be installed by special personnel. The diameter of the cable entering the junction box shall be consistent with the aperture of the rubber pad. The compression of the terminal head shall ensure that there is no gap between the rubber pad and the cable and between the rubber pad and the junction box, otherwise the flameproof performance will be lost.