The mine loader is equipped with a crushing hammer. As we all know, the crushing hammer is installed on the excavator, but there will always be customers calling to inquire whether the mine loader can be equipped with a crushing hammer? Is it powerful!
破碎錘以礦用裝載機(jī)為媒介,以我的工作經(jīng)驗(yàn)徹 底能夠加裝,并且以前搞過(guò)很多臺(tái),說(shuō)起怎么樣用:,礦用裝載機(jī)破碎錘功能強(qiáng)大,礦用裝載機(jī)加裝破碎錘都是加裝的中小型號(hào)破碎錘,30裝載機(jī)一般加裝85MM的破碎錘,50裝載機(jī)加裝100毫米的破碎錘,并且都是直錘,破碎錘和礦用裝載機(jī)中間也要訂制聯(lián)接架。
Taking the mining loader as the medium, the crushing hammer can be completely installed with my work experience, and I have done many sets before. How to use it: first, the crushing hammer of mining loader is powerful. The crushing hammer of mining loader is installed in small and medium-sized models. Generally, 85mm crushing hammer is installed on 30 loader and 100mm crushing hammer is installed on 50 loader, And they are all straight hammers. The connecting frame should also be customized between the crushing hammer and the mining loader.
此外,礦用裝載機(jī)加裝破碎錘花費(fèi)高,管路包括一個(gè)大個(gè)兒的繼電器因此破碎錘管路工程造價(jià)也比挖機(jī)的管路要貴出一倍上下,破碎工作時(shí)由于礦用裝載機(jī)沒(méi)有360度轉(zhuǎn)動(dòng)作用。
In addition, it is expensive to install a crushing hammer on the mining loader, and the pipeline includes a large relay. Therefore, the engineering cost of the crushing hammer pipeline is twice as expensive as that of the excavator. During crushing, the mining loader does not rotate 360 degrees.
常常必 須破碎時(shí)調(diào)節(jié)視角,左擺右晃的,干活兒時(shí)還必 須一臺(tái)礦用裝載機(jī)相互配合,立即把破碎后的料清 除出來(lái),便于下一輪破碎,礦用裝載機(jī)配破碎錘由于視線(xiàn)好,破碎錘非常容易打,會(huì)造成破碎錘效率高,如果是暫時(shí)性或是活并不是許多能夠考慮到,重要?jiǎng)?wù)必要在平地工作,自然環(huán)境務(wù)必符合條件!
It is often necessary to adjust the angle of view during crushing and swing left and right. When doing work, a mining loader must cooperate with each other to immediately remove the crushed materials for the next round of crushing. The mining loader is equipped with a crushing hammer. Due to good sight, the crushing hammer is very easy to hit, which will lead to high efficiency of the crushing hammer. If it is temporary or live, not many can be considered, It is important to work on flat ground, and the natural environment must meet the conditions!